Understand the Next 5G Hurdle: Conformance and Device Acceptance




Understanding the Next 5G Hurdle:
Conformance and Device Acceptance Test
March 21, 2019
10 a.m. PT – 1 p.m. ET

As 5G New Radio (NR) advances towards widespread commercialization, devices and base stations need to meet 3GPP (Third Generation Partnership Project) requirements before being introduced into the market. Conformance and device acceptance tests are major milestones, but test specifications and test methods are still not finalized. How can manufacturers ensure their designs will meet specifications, especially in the new frequency range 2 (FR2) mmWave operating bands? This webinar reviews the status of 3GPP RAN 4 and RAN 5 and provides guidance for testing 5G devices and base stations.
Three key learnings:
·     5G testing requirements and timelines
·     5G testing methodologies for FR1 and FR2
·     How manufacturers are testing 5G products
If you cannot attend the live event, please register and we will send you a link to the recording.
Sincerely,

Keysight Technologies
Presenter
Sheri DeTomasi
5G New Radio Solutions Lead
Sponsored by:

Contact
US 1 800 829-4444
Canada +1 877 894-4414
Contact an Expert
Stay Connected With Us:
Facebook
LinkedIn
Twitter
YouTube
Blogger

Postagens mais visitadas deste blog

Programação de um CLP: Modos de programação

The Mystery of USB Chargers

Subwoofer Repair